Riverton School District
Four brick schools re-roofed across three summer breaks: slate gables relaid, flat roofs rebuilt to drain.
- Roof
- 96,000 sq ft
- Schedule
- 3 summers
- Open roofs at 3pm
- Zero
The brief
The district had four 1920s and 1950s schools with the same problem: steep slate gables in fair shape, and flat roofs between them that ponded after every storm.
What we found
The flat sections had been re-covered three times without anyone adding slope. Water sat on them for days, and the gutters at the slate edges were sized for a much smaller roof.
What we did
- Stripped the flat roofs to the deck and added tapered insulation so every section falls to a drain.
- Covered them in heat-welded 60-mil PVC, with welded seams tested by probe at the end of each day.
- Repaired the slate gables where needed and re-lined the gutters at the slate edges in larger copper sections.
- Ran the work only in summer break, closing every open section by 3pm in case of afternoon storms.
How it ended
Four schools, three summers, no ponding. The district now has one roofer’s records for every roof it owns.


How the time went
One foreman for the whole job, and a written update at the end of every week.
- Summer 2023
- Two campuses
- Summer 2024
- Third campus
- Summer 2025
- Fourth campus, gables relaid