
Roofs for the
next century.
Natural slate, standing seam and cedar for Portland’s older houses. Surveyed from the ladder, priced in writing, laid by our own crews since 1996.
Irvington, 1912 CraftsmanVermont slate, copper valley and gutters · 2025
Slate, seam and cedar for Portland’s older houses
Our own crews lay every roof from one written price, under a foreman you’ll know by name. Family owned in Sellwood since 1996.
How we work

- Family owned since, three generations on the tools
- 1996
- Roofers on our own payroll, no subcontractors
- 31
- Crews, each with one foreman from survey to walkthrough
- 4
- Workmanship warranty that moves with the house
- 25yrs
What we lay, and what it costs
Installed prices per square (100 sq ft), with tear-off, Portland 2026. Your survey gives the real number.
All services- No. 01Natural slateLaid, restored and matched to the quarry.Lasts80–150 yrsInstalledfrom $2,400 / sq

- No. 02Standing seamPanels formed on site, no exposed fasteners.Lasts50–70 yrsInstalledfrom $1,350 / sq

- No. 03Cedar shakeHand-split red cedar that breathes.Lasts30–40 yrsInstalledfrom $1,100 / sq

- No. 04Architectural shingleThe honest choice for most budgets.Lasts25–30 yrsInstalledfrom $650 / sq

- No. 05Low-slope membraneFlat roofs that finally drain.Lasts25–30 yrsInstalledfrom $900 / sq

Roofs we’ve signed for
Houses are most of what we do. These are the bigger roofs other crews passed on.
All projectsSame house, eleven weeks apart.


- House
- 1912 Craftsman
- Roof
- 34 squares slate
- On site
- 11 weeks
- Copper
- Gutters, valleys
From the ladder to the last downspout
The same foreman from the first photo to the last, and every step goes into your job file.
- 01Day 1

Survey on the ladder
Forty-five minutes on the roof, photos of every plane, moisture readings at the valleys and a look in the attic.
- 02Within 48 hours

A price in writing
A fixed price with the photos, a drawn roof plan and every line item. It only moves if the deck surprises us, and you see why first.
- 03Build day 1

Tear-off
Gardens tarped, magnets swept twice a day, nothing left open if the forecast turns.
- 042–12 days

Course by course
Rotten boards replaced, ice and water shield three feet up every eave, then each course lapped over the one two below.
- 05Alongside

Copper, formed on site
Valleys, step flashing, chimney crickets and gutters bent and soldered in the driveway, fitted to this roof.
- 06Last day

Walkthrough and warranty
We walk the roof with you on the photos, hand over a 25-year workmanship warranty, and come back after the first big storm.
Priced and laid by the same crew
No salespeople and no subcontracted slaters. The person who prices your roof runs the crew that lays it.
Meet the crews
Dale ReyesForeman, Crew 2 · 19 years with Headlap“If something surprises us under the old roof, you hear it from me, with a photo, before we touch it.”


- Roofers on payroll
- 31
- Crews
- 4
- Average years with us
- 11
Owners who’d call us again

“Two other roofers told us to tear the slate off. Headlap reused most of it, matched the rest, and the house looks like 1924 again, just dry.”

“Dale’s crew cut every slate on the turret to its own taper. Eleven winters of a ceiling stain, gone in the first one.”

“The price was the price. The one rotten valley they found, they photographed and showed us before touching it.”

“Every morning the foreman texted what they’d open that day and how they’d close it if rain came. It came twice. Nothing got wet.”

“They talked us out of cedar for the north slope and into seam. Four winters later it still sheds every needle off the fir.”

“I called the leak line at seven on a November night. Someone was on the roof with a tarp by nine, and back on Friday with the right flashing.”

“They sorted every old slate on the lawn, kept two thirds and found the rest at the same Vermont quarry. You can’t see where the new ones went.”

“We had a small budget and they didn’t try to upsell it. Good shingle, proper flashing, copper where it mattered, and the written price is what we paid.”

“After the ice storm they tarped us first and quoted later. When we did redo the roof, the tarp visit came off the bill.”
What a roof costs per year
Divide the price by the years it lasts and slate stops looking expensive. Pick a house size.
Copper bar: lowest cost per year at this size. Installed prices include tear-off, deck repair allowance, underlayment and flashing. Portland, 2026. Your survey gives the real number.

Leaking tonight?
(503) 555-0149A roofer answers, every day October to April, 6am to 10pm.
- TonightYou call, we answerWe ask where the water is coming in and what to move.
- Within 24 hTarped and photographedDated photos and measurements for your insurer.
- Next dry dayFixed properlyFlashing, valley or slate, with a written price first.
Questions we get

Often most of it can. Good slate outlives two or three sets of nails. We sort every slate as it comes off, relay the sound ones and match the rest from the same quarry where it still runs.
Most older Portland houses were framed for heavy roofs. We check rafter size and span in the attic during the survey; where it needs help, sistering a few rafters is usually a day’s work.
It changes the paperwork more than the roof. We prepare the samples and drawings the review board asks for and match profiles, colours and copper details to the period.
Copper outlasts the slate under it, can be soldered watertight on site and is easy to repair. On a 100-year roof, aluminium gutters and flashing are the first thing to fail.
Slowly. It goes bronze within a year and takes fifteen to thirty years in Portland air to reach the green patina. We can pre-patinate it if you want the colour now.
Yes. We open only as much roof as we can close the same day, every crew carries tarps sized for the job, and slate and copper work often runs right through winter.
Yes. We document damage with dated photos and measurements, meet the adjuster on site if you want us there, and write the scope in the format adjusters expect.
Ten percent secures the dates and orders material; the balance is due at the walkthrough. Slate jobs are billed in stages because slate is ordered by the pallet.

Let’s get on your roof.
Forty-five minutes on the ladder, photos of every plane and a written price within 48 hours. Free inside Portland city limits.

A foreman does your surveyNot a salesperson. The person who prices your roof runs the crew that lays it.
- Office
- (503) 555-0148Mon–Fri 7:00–17:00
- Leak line
- (503) 555-0149Every day Oct–Apr, 6am–10pm
Book a roof survey
Thanks, . Your survey request is in.
The office will call you within one working day to set a time on the ladder.
This site is a template: nothing was sent.



